How long between a supplier going dark and your line stopping?
The real buffer between a supplier site going quiet and a line-down call: what sets your days of cover and why the clock starts earlier than you think.

Your runway is your days of cover for that part, and most control towers find out it was shorter than the number sitting in their ERP.
Every planner has a number in their head for this. Six weeks of safety stock on the connector, four weeks on the casting, two on the single-sourced sensor nobody ever dual-sourced because the volume didn't justify it. That number is your runway. It's also usually wrong, because it assumes the clock starts the day the plant stops shipping, and it doesn't.
What sets the runway
Your buffer is a function of three things: safety stock at your own dock, safety stock sitting at any tier-1 or tier-2 intermediary between you and the dark site, and the lead time it would take to qualify or expedite an alternate source. Add those up in days of supply and you get your real number, not the one in the MRP screen.
A few things shrink that number faster than people plan for:
- Single-sourced parts with no qualified second source. The buffer you have is the buffer you have. There's no expedite lane, because there's nowhere to expedite from.
- Consignment or VMI stock that looks like inventory on your books but is physically sitting in a yard at the supplier's site, which may be the same yard that just went quiet.
- Kanban-pull lines running lean on purpose. A plant tuned for two days of cover doesn't have a disruption buffer. It has a disruption trigger.
The real number is six weeks of safety stock, minus whatever's stuck at the supplier's own yard, minus the week it takes to even confirm the site is down.
The part nobody puts in the model: detection lag
The detection lag is what eats your buffer. Most control towers don't learn a critical site has gone dark on the day it happens. They learn when the supplier's account rep finally returns a call, when a tier-1 flags a missed shipment on their own line, or when a quarterly business review surfaces a production number that's been soft for weeks. That gap routinely runs ten days to three weeks before anyone on the buy side has a confirmed signal.
Run that against a real buffer. A plant holding four weeks of days of cover on a part, but not finding out about a supplier outage until week two of that outage, effectively has two weeks of runway left to source, qualify, or air-freight an alternate. A plant holding two weeks of cover, with the same two-week detection lag, has already gone line-down before anyone picked up the phone.
That's the math worth doing: take your days-of-cover number for each critical part, and subtract your honest detection lag, not the target detection lag you'd get if the supplier called you the day the line stopped. Most control towers have never measured that lag because there was no way to date it. The supplier call comes when it comes.
That's the gap Supply Disruption Alerts is built to close: a dated alert the day yard activity at a named critical plant collapses or a fire or flood signature shows up, tied to the part that site makes, so the clock on your buffer starts the day the yard goes quiet, whether or not a supplier has returned your call yet.